Skip to content

Format and fix ci

Format and fix ci #3

Triggered via push December 17, 2025 16:55
Status Failure
Total duration 2m 12s
Artifacts

ci.yml

on: push
Matrix: build-linux
Matrix: build-macos
Matrix: standards
Fit to window
Zoom out
Zoom in

Annotations

10 errors
format
Process completed with exit code 2.
build-linux (clang)
Process completed with exit code 2.
standards (17)
Process completed with exit code 2.
standards (20)
The strategy configuration was canceled because "standards._17" failed
standards (20)
Process completed with exit code 2.
standards (23)
The strategy configuration was canceled because "standards._17" failed
standards (23)
The operation was canceled.
build-linux (gcc)
Process completed with exit code 2.
build-windows
Process completed with exit code 2.
build-freebsd
The process '/usr/bin/bash' failed with exit code 2